Friday, October 30, 2009

Urine Samples Detecting Std

33rd + + 34. 35. Drywall, plumbing, electrical, plastering and

Or a house look like home with plaster from

I summarize the last 3 Bautage because it depends would have given her all the pictures are not too many differences. The trades were always the same and so it offered to make a big report.



This week really has been busy.

I must say the plasterers have brought great power and actually have each day to 19 clock in the evening working on the site.




Before / After

was first plastered the house from outside and then started with the interior.


But here you had to look a little bit, because first had electrical, plumbing and drywall be finished.
are now been set, all window sills and it looks all right looks like a finished window sill. The office is ready, living room, kitchen floor, the exterior walls upstairs, the staircase.



In the guest toilet and bathroom in a different kind of material was used, at least it looks much darker.

Even the plumbing is advanced. All cables are laid.
guest toilet, bathroom, the bathtub, sink, shower everything already there.



Next week at this stage a heated floor and then faster than we can see the floor.

is moving ahead, then!

We are glad that everything runs so smooth and clean, and look forward to Construction Week.
But until then, we wish everyone a nice weekend Cheers

say Liechti