dry phase of the floor tiles +
Now, the end of the construction period is approaching and once again, our nerves a bit strained.
For as you see now is to not really much happened.
Outside the house now, the Telekom, RWE and the water companies put their connections to the house. When exactly is happening I do not really know.
now and since the floor in the house, running the building dryers and heating makes the house into a sauna is not really much happened.
The tiler On Wednesday started its work in the bathrooms.
One day he has thought of everything and the next 2 days he started to make the tiles on the walls.
guest bathroom with shower on the ground floor
left without tiles
right with tiles in the toilet area, sink and shower
Tomorrow we will then continue with the tiles and more then a week should not happen according to our Site Manager Mr Bosch.
Construction dries and then we have only 2 weeks to a final building inspection.
increases the tension!
For it is still to be done.
- Install wood floor / stairs
- filling work
- The basement
- Sanitary
- Power / light
- painting
- 11.12.2009 final acceptance
we wait for things to get there.
us and me is the dry phase in handy, as the Casa de Liechti that is in a state of emergency and disease, and so not fall within humanity.
will therefore summarize I also next week, the day of the tile laying.
Stormy greetings from the Rhineland, today after
Waterford, Michigan, United States who always looks at our building blog there too.
love you and we would welcome any comments from you lot.
a good and healthy start to the week
your Liechti