33rd + + 34. 35. Drywall, plumbing, electrical, plastering and

Or a house look like home with plaster from

I summarize the last 3 Bautage because it depends would have given her all the pictures are not too many differences. The trades were always the same and so it offered to make a big report.



This week really has been busy.

I must say the plasterers have brought great power and actually have each day to 19 clock in the evening working on the site.




Before / After

was first plastered the house from outside and then started with the interior.


But here you had to look a little bit, because first had electrical, plumbing and drywall be finished.
are now been set, all window sills and it looks all right looks like a finished window sill. The office is ready, living room, kitchen floor, the exterior walls upstairs, the staircase.



In the guest toilet and bathroom in a different kind of material was used, at least it looks much darker.

Even the plumbing is advanced. All cables are laid.
guest toilet, bathroom, the bathtub, sink, shower everything already there.



Next week at this stage a heated floor and then faster than we can see the floor.

is moving ahead, then!

We are glad that everything runs so smooth and clean, and look forward to Construction Week.
But until then, we wish everyone a nice weekend Cheers

say Liechti

Tuesday, October 27, 2009

Old Vintage Make Up Cans

32nd Days cleaning and Co.

exterior plaster, plumbing and drywall

all at the same time in a house and ours.

The walls are now all on the floor and the huge expanse that is there until the day before yesterday there was has now been brought by partitions into molds.

I'm thrilled, especially of children's eyewear, which has the great niche to the bathroom.
build super easy for a child, for example to his crib where to put in, or a cave.

No.2 missing children but this niche but is still super nice and bright, especially
That was very important that there is much light in the house.




The master bedroom with dressing room and bathroom on the other side are a perfect distribution.

For so once the children have their side of the Home and we the other.











The bathroom is beginning to take also the form and you can see where once the shower room, the large sink and toilet in the "T" will be.

The tub will have its place among the slope directly below the skylight.


stars and bathtub what more could you want!

Fortunately we have a skylight in the hallway, respectively. use of the staircase in addition . Let
because otherwise the great staircase just always dark and you would never see or should always wear light.

In the guest bathroom and the bathroom above
preparations for sanitary and water supply were laid.




And the cleaners have started outside the top of the house to plaster over the bricks.





they have also started with the interior window sills.



So every day something new happens and the plan for the next 3 weeks looks roughly like this:

week 44
Mon / Tue drywall and exterior rendering
Mon body shop installing electrical and heating / sanitation
Wed / Thu interior plaster work and joint work brickworks
Fri ; exterior rendering

CW 45
Mon / Tue heating up work and tub and shower trays
Wed / Thu screed works
Thurs exterior plaster painting
Fri ; dismantle scaffolding

CW 46
heat from Mo-floor heating (Tile range)
Mon-Fri establish service connections
Mon / Tue ready electric installation, grouting work

It will happen a lot in the next 3 weeks.
must indeed because we have only a little over 6 weeks should be up to week 50 in the final inspections and completion of the house.

We are all excited! arise

regards and a nice evening
The Liechti

Monday, October 26, 2009

Cube Field Pink And White

31st The dry days

The walls were

Today, as at the moment every day the drywall at the construction site and have had a raging upstairs.

And lo! to my supervisor meeting with Mr Bosch had then already the first walls in the rails.

It is slowly taking Gestallt and one can imagine as slow as the whole time from the room is his.





The bathroom was the "T" placed in the left of the shower, right in front of the toilet and put in the wall hang gigantic basin is.





What we now retrospectively is taken to have a bin in front of the wall to the sink, so that there ect all the necessary things such as razor, toothbrush and toothpaste. can remedy.

The electrician has been drilling the last holes in the ground floor and then there the light of the EC to traverse.

have in my conversation with Mr Bosch, I know that the cleaner the outside has already begun preparations to meet and then a week even in the interior begins.



Also, the clinker plant will be grouted done. The plumbing trades and will also start the dry run again as well.

Tomorrow I'll set the next 3 weeks of the construction plan, then we see again the rough direction of where it goes.

Many greetings and a good start to the day
your Inga

Sunday, October 25, 2009

How To Convert .ipa To.jar

invitation to the "day of open construction"

Dear readers, prospective homeowners,
friends and Viebrockhaus interested


Today I would like to officially Day of open construction " invite.

The company Viebrockhaus and of course we want to give you the opportunity to make yourself a picture of how such a house is built and looks in its raw state.

We want to invite you:

  • Date: Sunday 15 November 2009
  • time: from 13:30 to 16:30 clock

If you are interested please do not hesitate to contact 11/11/2009 at our vendor
Enrico to Schneider of Viebrockhaus in Kaarst. He will then tell you all the information
and the exact address.

The contact details of Mr. Schneider:

E-mail: @ enrico.schneider viebrockhaus.de
Phone: 02131 / 51226-56
www.viebrockhaus.de

I can even put your heart in advance to Viebrock in the model house park to go to Kaarst around there to look at the various houses ready to go once through the sampling issue and get a feel for the houses and the material.

My husband and I were happy then if we had had the opportunity to watch us live in the house building search and decision process a body shop. It gets really just a feeling for how something is created and looks. For all the show houses are of course furnished and ready. As you may have the problem really imagine how the whole "naked" look would.

So, it would be very glad you are on 15 welcome November at us at the construction site and you may so maybe a little help in your decisions and issues further.

Regards your family Liechti


PS: Friends and family you know where to find us ;-)









20 Megapixel 35mm Dslr Camera

30th Dry days and the Second Electric

Or the cable clutter is taking shape

The weekend is again right doll has done something.

have the electrician after having set all the slots and sockets, then put all cables in the ground floor and pulled.




All cables run outside long on the walls so that the room itself down to the stream which is used for cooking, not across runs over the living space.


I would at all ports, switches and cables for different Electricity, telephone and RJ45 but get confused, but that yes, we have the professionals at work!





is at the top of the advanced visible and dry as you can see was used in schwindelden heights.




The whole ceiling is now suspended, the cables for the electricity to come clean out of the holes.





And after the rails for the walls on the ground was already mounted in the week, are now all the tracks on the ceiling and there are already perpendicular to the elements for the bathroom and the hallway on the parent page.

tomorrow so I think we in the course of the day will see walls and the gigantic space up there, then pick up his room types will.

Then we got a week our bees Beisser for the brickworks and properly pressed on Saturday in beautiful sunshine in the air vents.
Was a very simple and fast work. This Bees are more expensive than alternative products, but the use is great, the material to be and I think the tenants stay away.

Tomorrow is Monday, so site managers meeting with our new site manager Mr Bosch. He is responsible for the interior.




where I learn more about what will happen in the week. For it is now again a silo in front of our house and I think that the plaster on the walls.

I'll tell you more tomorrow and I wish you early today for a great evening and tomorrow a wonderful start to the week.

good night
your Inga

Thursday, October 22, 2009

Wart Appeared On Stomach

29th Days dry and electric

slots, cables and cover plates

Today was the attic of the inner part covered almost completely with plasterboard.
is in the bathroom this greenish because there a special plate is taken as it is a feutschtraum.
Only small pieces are missing and I think tomorrow will all be closed.

were also covered all the windows.

Geerkens The company has started with the electrical work. So you will have a lot of cable slots and get to see.

everywhere in the places where doses were planned slots have been made into the wall and plastered the corresponding doses.

The bathroom was extra strong, light and power for a sauna that will eventually come down again.




And upstairs it looks a bit like a cable jungle.


I have all boxes and cables on the ground floor and took pictures, so you know later where and how the cables and run slots. A good tip for everyone who builds, because I was certainly short at 4 photos already after so time to say where the cable problem is exactly.



?? ? ? ? ? ? ? ?


Only the basement was not made anything yet, which is then certainly.

I also have received today the "bee-biter" delivered to the site.
This will put us on the weekend in the brick air vents.
is the brickworks against the entry of mice, wasps and other sub-tenants only.



So today is a lot going on.


kitchen side refrigerator is

morning Friday and I'll try 2 times to go to the site to see exactly how the interior construction is ongoing and to report back. Until then, I

wish everyone a good time
Regards Inga your

PS: Get well soon to all who are sick in bed, be it with a flu or a toothache ;-)