slots, cables and cover plates
Today was the attic of the inner part covered almost completely with plasterboard.
is in the bathroom this greenish because there a special plate is taken as it is a feutschtraum.
Only small pieces are missing and I think tomorrow will all be closed.
everywhere in the places where doses were planned slots have been made into the wall and plastered the corresponding doses.
And upstairs it looks a bit like a cable jungle.
I have all boxes and cables on the ground floor and took pictures, so you know later where and how the cables and run slots. A good tip for everyone who builds, because I was certainly short at 4 photos already after so time to say where the cable problem is exactly.
?? ? ? ? ? ? ? ?
Only the basement was not made anything yet, which is then certainly.
This will put us on the weekend in the brick air vents.
is the brickworks against the entry of mice, wasps and other sub-tenants only.
So today is a lot going on.
kitchen side refrigerator is
wish everyone a good time
Regards Inga your
PS: Get well soon to all who are sick in bed, be it with a flu or a toothache ;-)
0 comments:
Post a Comment