44. to 49 Construction day dry phase

dry phase of the floor tiles +


Now, the end of the construction period is approaching and once again, our nerves a bit strained.
For as you see now is to not really much happened.

Outside the house now, the Telekom, RWE and the water companies put their connections to the house. When exactly is happening I do not really know.

now and since the floor in the house, running the building dryers and heating makes the house into a sauna is not really much happened.

The tiler On Wednesday started its work in the bathrooms.
One day he has thought of everything and the next 2 days he started to make the tiles on the walls.


guest bathroom with shower on the ground floor

left without tiles

right with tiles in the toilet area, sink and shower




Before

After





Tomorrow we will then continue with the tiles and more then a week should not happen according to our Site Manager Mr Bosch.
Construction dries and then we have only 2 weeks to a final building inspection.

increases the tension!
For it is still to be done.

- Setting up kitchen
- Install wood floor / stairs
- filling work
- The basement
- Sanitary
- Power / light
- painting
- 11.12.2009 final acceptance

we wait for things to get there.

us and me is the dry phase in handy, as the Casa de Liechti that is in a state of emergency and disease, and so not fall within humanity.


will therefore summarize I also next week, the day of the tile laying.

Stormy greetings from the Rhineland, today after
Waterford, Michigan, United States who always looks at our building blog there too.
love you and we would welcome any comments from you lot.

a good and healthy start to the week
your Liechti

Thursday, November 12, 2009

Art's Story Kate Cann Ebook

40th + 41. + 42. + 43. Construction day dry phase

The screed is laid

This week does not happen a lot.
The screed has been laid in only 2 days on the first floor, ground floor and basement.
super fast!

Then we had the first not to the house and had to wait again.




On Monday, the framework was cut by the house.
now sees the house just like a house.






were placed inside Bauteockner and underfloor heating will be turned up and running. A tropical climate in the house and you get a shock if you step back from the door. Nice and cold, brrrrr!





is otherwise not much really happens.

In the base room, the connections for the water to be changed again because the tub was moved and forgot they had to adjust the rest. So the whole
is not centered like it should be. But that is actually still happen this week, so next week, the tiles can be made.

Sunday is the day of the open shell, unfortunately without the Liechti family that Lasse and I very sick and can not find a green branch.
Mittelohentzündung, sore throat, cough, runny nose, fever just everything you can imagine.

why I wish Mr. Schneider of Viebrockhaus much fun and success, I would have liked it.

Now tomorrow I'll do it again hopefully in the light of the construction site, which right now is just very difficult.

I wish you all a pleasant evening
care of your health!

Cheers
your Inga

Thursday, November 5, 2009

Buy A Monster Energy Drink Fridge

Summary 36th +37. +38. +39. Days days

brick plaster floor insulation, underfloor heating, plumbing, flooring

4 days have passed and a lot has happened.
Unfortunately I can not tell from the construction as I would like to, because our son is very sick doll and all my time and even more to complete.

This is not to say that there is no information and images are the last days.
Just in compressed form, and soon!

On Monday 36th Days was the brickworks that once we have around the house on the ground floor perfectly plastered over. Now it looks really great and good that we have set the bees Beisser advance into the ventilation slots. That would now think I do not go so easy.

















On Tuesday 37th Day we have now become owners of their own bath and 2 showers.
because they were built before the underfloor heating. It takes so slow to take shape.



On Wednesday 38th Day is the floor in the ground floor and first floor have been insulated.
Then, a film and a boundary wall has been installed.
And at the end of the day was already dark as it was then I first Photos of our finished making laid-floor heating. Looks kind of funny from the whole.



Today Thursday 39th Day have begun the work floor and first floor plus a portion of the bottom are ready. Tomorrow, then the whole house to be finished and we can not once the house.
The soil must rest.



I wish tonight all have a nice weekend, fits on your health and we hear you again next week.

your Inga

PS: Today, a special greeting to my loyal readers, "Limberg" Thanks for your always so busy since. And I hope Lasse goes well soon I can inform you once a day ;-)

Friday, October 30, 2009

Urine Samples Detecting Std

33rd + + 34. 35. Drywall, plumbing, electrical, plastering and

Or a house look like home with plaster from

I summarize the last 3 Bautage because it depends would have given her all the pictures are not too many differences. The trades were always the same and so it offered to make a big report.



This week really has been busy.

I must say the plasterers have brought great power and actually have each day to 19 clock in the evening working on the site.




Before / After

was first plastered the house from outside and then started with the interior.


But here you had to look a little bit, because first had electrical, plumbing and drywall be finished.
are now been set, all window sills and it looks all right looks like a finished window sill. The office is ready, living room, kitchen floor, the exterior walls upstairs, the staircase.



In the guest toilet and bathroom in a different kind of material was used, at least it looks much darker.

Even the plumbing is advanced. All cables are laid.
guest toilet, bathroom, the bathtub, sink, shower everything already there.



Next week at this stage a heated floor and then faster than we can see the floor.

is moving ahead, then!

We are glad that everything runs so smooth and clean, and look forward to Construction Week.
But until then, we wish everyone a nice weekend Cheers

say Liechti