Tuesday, October 27, 2009

Old Vintage Make Up Cans

32nd Days cleaning and Co.

exterior plaster, plumbing and drywall

all at the same time in a house and ours.

The walls are now all on the floor and the huge expanse that is there until the day before yesterday there was has now been brought by partitions into molds.

I'm thrilled, especially of children's eyewear, which has the great niche to the bathroom.
build super easy for a child, for example to his crib where to put in, or a cave.

No.2 missing children but this niche but is still super nice and bright, especially
That was very important that there is much light in the house.




The master bedroom with dressing room and bathroom on the other side are a perfect distribution.

For so once the children have their side of the Home and we the other.











The bathroom is beginning to take also the form and you can see where once the shower room, the large sink and toilet in the "T" will be.

The tub will have its place among the slope directly below the skylight.


stars and bathtub what more could you want!

Fortunately we have a skylight in the hallway, respectively. use of the staircase in addition . Let
because otherwise the great staircase just always dark and you would never see or should always wear light.

In the guest bathroom and the bathroom above
preparations for sanitary and water supply were laid.




And the cleaners have started outside the top of the house to plaster over the bricks.





they have also started with the interior window sills.



So every day something new happens and the plan for the next 3 weeks looks roughly like this:

week 44
Mon / Tue drywall and exterior rendering
Mon body shop installing electrical and heating / sanitation
Wed / Thu interior plaster work and joint work brickworks
Fri ; exterior rendering

CW 45
Mon / Tue heating up work and tub and shower trays
Wed / Thu screed works
Thurs exterior plaster painting
Fri ; dismantle scaffolding

CW 46
heat from Mo-floor heating (Tile range)
Mon-Fri establish service connections
Mon / Tue ready electric installation, grouting work

It will happen a lot in the next 3 weeks.
must indeed because we have only a little over 6 weeks should be up to week 50 in the final inspections and completion of the house.

We are all excited! arise

regards and a nice evening
The Liechti